F
Fishidiot
Active member
- Joined
- Sep 9, 2006
- Messages
- 9,960
Cumberland Valley TU, the PFBC, and some other local organizations are currently conducting a stream bank stabilization project on a popular section of Yellow Breeches (this is outside the reg water) that has long been shallow and suffers bank erosion and side cutting. The photos below show the section targeted for repair work; some of the eroded banks; and the beginning of the back hoe work and placement of timbers. The lower photo shows forum member JPitmann drilling logs for pinning with rebar. When this project is finished I'll post more photos.
DaveW
DaveW