Sad to say, long leaders have never become "the popular leaders". If it is not 7 1/2 or 9 foot most will not understand longer leaders. I personally like 15 foot leaders for summer fishing. As far as a 18 ft. leader goes. I would guess 99.9% fishermen will never use.
The Euro style, a little different here. I think a fad but time will tell!
If only one leader, the most popular of all time, Hands down ---it is the 9ft., 5x.